- 18 YEARS TEAM EXPERIENCE : DO & DONT'S - IDENTIFY ISSUES BEFOREHAND & MITIGATE RISKS - ADVICE ON WISHLIST VS BUDGET - COST, TIME, RESOURCE MANAGEMENT - 0% PROMISE. 110% RESULT - 3-6 MONTHS WARRANTY - DETAILED TECHNICAL DRAWINGS FOR BUILD - THOROUGH CONSULTATIONS - STRUCTURED WORKFLOW - PERSONALIZED TEAM - DEDICATED SITE SUPERVISOR - QUALITY ASSURANCE BY TOP MANAGEMENT
OUR QUALITY ASSURANCE
FINEST MATERIAL
We used nyatoh is used for crown molding frames
SATIN / MATTE FINISH
Satin glow FREE from high Volatile Organic Compound (VOC)
EXPERTISE
No guarantee is needed
MOSQUE DESIGN
WAINSCOTING ORDERING WORKFLOW
#STEP 1 : PLANNING
You have to pick design from our catalogue list and determine the wall you intended to install wainscoting. Total area of the wall in square feet is required for quotation purpose.
#STEP 2 : QUOTATION & PAYMENT
Base on your requirement, we will issue an official estimated quotation indicating the size, material, and design. You have to make payment as per PAYMENT SCHEDULE listed in QUOTATION. NO WAINSCOTING DETAILED design work to be conducted at this stage.
#STEP 3 : DESIGN PROCESS
Upon payment completion, we will produce elevation drawings within 3-5 working days (subject to our existing work load). The drawings are ONLY subject to 2x revisions.
#STEP 4 : FABRICATION & INSTALLATION
Once the design approved by you. We will fabricate the wainscoting. Once ready, installation will be scheduled based on both side availability. If there is changes on costing (PLUS or MINUS) based on the final design, a revised quotation will be provide.
#STEP 5 : PAYMENT & HANDOVER
Once installation completed. You have to pay the outstanding balance as agreed in quotation within 3 working days. Installation WARRANTY provided as listed in quotation.
INSTALLATION TYPE
With back panel or direct to wall
MATERIAL USE
Nyatoh, MDF, reeded and fluted panel
DESIGN TYPE
Wainscoting & wall panel
MOSQUE DESIGN
WONDERING HOW ONE OF OUR WAINSCOTING INSTALLATION?
Sneak preview of our wainscoting installation process.